HOW LONG DOES THE AVERAGE LANDSCAPING PROJECT TAKE TO COMPLETE

On average a landscape project can take 1 week to several months to complete. The timeline of the project will vary depending on how simple or complex the landscape installation is.

More simple landscape installations, such as a garden design, can take 1-2 weeks to complete. More complex landscape installations that include labor-intensive additions such as outdoor kitchens, grade changes, leveling, compacting, and large hardscapes can take 2-4 weeks. If features such as a cabana or a pool are included in the landscape project, it can take 2-3 months to complete.

In addition to the complexity of the project, there are other factors that can affect the duration of a landscaping project. For example, obtaining necessary permits can take anywhere from 2 weeks to 6 months depending on the municipality where the project is taking place. The availability of materials can also be a factor, as some materials may take longer to acquire or install than others. For example, natural stone can take longer to acquire and install than interlocking pavers yet it can last a lifetime and provide the perfect touch that you envisioned for your space.

It's important to work with a reputable and experienced landscaping company who can help you understand the timeline for your project and make sure that it stays on track. With the right team in place, you can ensure that your landscaping project is completed efficiently and to your satisfaction.

Contact one of our landscape specialists and start designing your dream yard today.